Statewide Work Zones
Counties:
All work subject to change due to weather or priority adjustments. Motorists are urged to exercise caution while passing through work zones. Workers may be on or near the roadway. Signs will be posted and flag persons will be present in areas where traffic will be impacted. Please contact the MoDOT Customer Service Center by calling the toll-free number 1.888.ASK.MoDOT (275.6636).
Receive FREE email updates
PDF File: Week of July 7
Interstate 44
Phelps County
MoDOT crews will perform milling on the roadway. Milling removes excess material from cracks and
joints.
Location: West bound mile marker 179 to 177.
Pulaski County
MoDOT crews will perform shoulder repairs. This function removes ruts, low areas and high spots on
the shoulders
Carter County
Roadway Maintenance
Route E:
MoDOT crews will patch potholes to restore shape and roadway stability.
Various Routes:
MoDOT crews will perform vegetation control and on replace, install and or maintain roadway signs
Carter County & Shannon County
Route 60:
Contractor crews are constructing lane additions.
Location: from Winona, Mo. to west of Van Buren, Mo. includes grading, paving, culverts and
bridges. Route Y near Fremont is scheduled to be closed from Friday, July 11 at 6 p.m., until
Sunday, July 13 to 8 a.m., in order to reconstruct the intersection with Route 60. Traffic accessing
the Fremont area will utilize various county roads in the area for access to Route 60.
Return to top
Crawford County
Construction Project
Route 8:
Contractor crews are resurfacing the roadway and constructing shoulders.
Location: Beginning at Steelville and ending east of Route 19, two disconnected sections.
Roadway Maintenance
Route M and VV:
MoDOT crews will perform a chip seal to seal out moisture and restore the roadway surface.
Return to top
Dent County
Roadway Maintenance
Route 19:
MoDOT crews will perform a chip seal to seal out moisture and restore the roadway surface.
Location:
Beginning from Junction 68 to Salem, Mo., to Cherryville, Mo.
Return to top
Howell County
Construction Project
Route 142:
Construction of two disconnected box culverts.
Location:
Beginning east of the intersection of Route JJ to west of the intersection of Route 17 near Lanton, Mo.
Route 60:
Contractor crews are grading, performing drainage work, paving, constructing bridges and
performing signal work.
Location: Beginning Route 63, near Willow Springs, Mo., to east of Route 17 north, near Mountain
View, Mo.
Roadway Maintenance
Route 17:
MoDOT crews will perform patching on the roadway. This function restores rideablility of the roadway surface.
Route AM:
MoDOT crews will replace drainage pipes near the roadway.
Routes W, WW, OO, and 17:
MoDOT crews will work on driveways and approaches, perform work to improve drainage and repair edge ruts.
Various Routes:
MoDOT crews will perform vegetation control, clean and reshape ditches, make repairs to driveways and entrances and replace, install and or maintain roadway signs on the right-of-way.
Howell County, Oregon County
Construction Project
Route 63:
Crews will widen and overlay existing Route 63, stripe for alternating passing lanes and perform
bridge rehabilitation.
Location: Beginning south of Business 63 intersection in West Plains, Mo., to Route 19 at Thayer,
Mo.
Return to top
Iron County
Roadway Maintenance
Route 21:
MoDOT crews will perform concrete replacement on the roadway.
Route 32:
MoDOT crews will perform shoulder repairs. This function removes ruts, low areas and high spots on
the shoulders.
Location: Starting at 21 intersection to the intersection of 49 in Bixby.
Route 72:
Crews will perform deck and sidewalk repairs to the bridge over the Missouri Pacific Railroad near
the intersection of Route 21.
Route 72:
Deck repair to the bridge located over Stouts Creek.
Iron County and St. Francois County
Construction Project
Route 221:
Crews are extending culverts, adding shoulders and constructing both centerline and edgeline
rumblestrips.
Location: Extends from Route 21 in Iron County to Route 67 in Farmington, Mo.
Return to top
Oregon County
Roadway Maintenance
Route 19:
MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry and
maintains stablility and proper drainage of water from the travel lanes.
Various Routes:
MoDOT crews will perform vegetation control and pave over the roadway surface to restore smooth
ride.
Return to top
Phelps County
Roadway Maintenance
Route 63:
MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry and
maintains stablility and proper drainage of water from the travel lanes.
Interstate 44:
MoDOT crews will perform milling on the roadway. Milling removes excess material from cracks and
joints.
Location:
West bound mile marker 179 to 177.
Various Routes:
MoDOT crews will mow, patch potholes and replace, install and or maintain roadway signs.
Pulaski County
Roadway Maintenance
Interstate 44:
MoDOT crews will perform shoulder repairs. This function removes ruts, low areas and high spots on
the shoulders.
Route Z:
MoDOT crews will perform shoulder repairs. This function removes ruts, low areas and high spots on
the shoulders.
Various Routes:
MoDOT crews will mow the right-of-way. This function controls roadside vegetation and improves
sight distance.
Return to top
Reynolds County
Construction Project
Route 34:
Crews are building asphalt shoulders, installing new pavement markings, including both center line
and edgeline rumblestrips, grading and performing culvert extension work.
Location: From the intersection of Route 21 east of the intersection of Route KK near Garwood, Mo.
Project Length: 9.3 miles
Roadway Maintenance
Various Routes:
MoDOT crews will perform vegetation control on the right-of-way.
Ripley County
Roadway Maintenance
Route 142 and Route P:
MoDOT crews will pave over the roadway surface to restore smooth ride.
Route Y:
MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or
other material in ruts along the edge of the roadway.
Various Routes:
MoDOT crews will work on driveways and approaches, cut brush and trim trees, perform vegetation
control, perform work to improve drainage and replace, install and or maintain roadway signs.
Return to top
Shannon County
Roadway Maintenance
Route 19:
MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry and
maintains stablility and proper drainage of water from the travel lanes.
Route 99:
MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or
other material in ruts along the edge of the roadway.
Routes 106, W, D, 99, and and E:
MoDOT crews will perform vegetation control on the right-of-way.
Routes EE and V:
MoDOT crews will patch potholes to restore shape and roadway stability.
Various Routes:
MoDOT crews will replace, install and or maintain roadway signs.
Return to top
Texas County
Roadway Maintenance
Route 137:
MoDOT crews will pave over the roadway surface to restore smooth ride.
Route 17:
Bridge approach work.
Location:
Buck Hollow over Jack Fork River.
Various Routes:
MoDOT crews will perform vegetation control on the right-of-way.
Texas County and Wright County
Route 60:
MoDOT crews will perform concrete replacement on the roadway.
Location:
Between the junctions of Route MM and Route 95.
Return to top
Washington County
Roadway Maintenance
Route 21:
MoDOT crews will perform shoulder repairs from the junction of Route C to Route 8. This function
removes ruts, low areas and high spots on the shoulders.
Return to top
|