| Location |
Bid Number & Project
Name |
Pre-Bid
Conference |
Bid
Opening |
Specification |
Attachments & Amendments |
Mandatory
Bid Submittal Forms |
Bid
Tabulation |
| Statewide |
IFB 9-080522 Time and Material Fabric Salt Storage Structures Maintenance & Repair - Price Agreement |
None |
May 22, 2008 @ 1:00 PM |
9-080522 IDC FabricSPEC |
Fabric Plan Holders
|
9-080522 IDC FabricBID |
|
| D3 Northeast Area, MO |
IFB 9-080505E Time and Material Project and Service Call Commercial Electrical Services Price Agreement |
None |
Bid Date Changed to May 29, 2008 @ 1:00 PM |
D3 IDC Electrical SPEC |
* Addendum 001 D3 Electrical
-D3 Electrical Plan Holders |
D3 IDC Electrical BID |
|
| D3 Northeast Area, MO |
IFB 9-080505M Time and Material Project and Service Call Commercial Mechanical Services Price Agreement |
None |
Bid Date Changed to May 29, 2008 @ 1:00 PM |
D3 IDC MECH spec |
* Addendum 001 D3 Mechanical
- D3 Mechanical Plan Holders |
D3 IDC MECH bid |
|
| D3 Northeast Area, MO |
IFB 9-080505C Time and Material Project and Service Call Commercial Carpentry Services Price Agreement |
None |
May 5, 2008 @ 1:00 PM |
D3 IDC CarpentrySPEC |
D3 Carpentry Plan Holders |
D3 IDC Carpentry BID |
|
| D10 Malden, MO |
IFB 9-080514 Construct Maintenance and Storage Buildings |
April 30, 2008 @ 11:00 AM (Time changed per addendum) |
May 14, 2008 @ 1:00 PM |
D10 Malden Maint SPEC |
*Addendum 002 D10 Malden
-SitePlan Addenda
* A 001 D10 Malden
- Malden Maintenance Drawings
- Malden Storage Drawings
- D10 Malden Mt Plan Holders
- FM11 Malden Meeting Roster |
D10 Malden Maint BID |
|
| D7 Joplin Garage, MO |
IFB 9-080501 Install Metal Roof System |
None |
Bid Date Changed to June 10, 2008 @ 1:00 PM |
9-0805001 D7 Garage RoofSPEC |
*Addendum 002 D7 Garage Roof
*A 001 D7 GarageRoof
-D7 Joplin Garage Plan Holders |
9-080501 D7 Garage RoofBID |
|
| D7 Nevada Project Office, MO |
IFB 9-080529 Structural Reroof |
May 20, 2008 @ 10:00 AM |
May 29, 2008 @ 1:00 PM |
D7 Nevada Structural Roof SPEC |
D7 Nevada Structural Roof DRAW.doc |
D7 Nevada Structural Roof BID.doc |
|
| |
|
|
|
|
|
|
|
Contractors that download documents will not be on the official plan-holders list; therefore, it will be the contractors' sole responsibility to download future bid information and possible amendments. Or, contractors may contact MoDOT's contract administer listed in the above solicitation(s) for inclusion in the official plan-holders list.Details of the procurement of supplies, materials, equipment and professional or general services, except for those required for construction of Missouri's transportation infrastructure, are covered in the links on this web page. Staff at the Missouri Department of Transportation executes these procurement functions in accordance with applicable statutes, and maximizes competitive procurement and awards on all its contracts.GENERAL DISCLAIMER
The Vendor is advised that attachments and amendments may exist to this document which provide additional information and instruction for the Vendor's reference. It is the sole responsibility of the Vendor to ensure he/she is in possession of all required attachments and amendments. The Vendor shall not be relieved of any responsibility for performance under the contract due to the failure of the vendor to obtain copies of the attachments and/or amendments.
All vendors' responses MUST be submitted in a sealed, hard copy form prior to the closing date and time indicated. It shall be the vendor's responsibility to be sure they are in receipt of all amendments, if any are issued. All responses are subject to the terms and conditions set forth by the Missouri Highways and Transportation Commission and the Missouri Department of Transportation. The documents are provided in Acrobat Reader format. Free Acrobat Reader download 